Friday, August 19, 2011

Ready for rain




After last weeks lesson in dry well digging it was a piece of cake to dig down and install one in front of the Cafe. Now no more watery sidewalk and overflowing downspots. Thanks for the lawnmowing and drywell installing for the second week in a row. It was a job that needed doing and the dogs, jo jo's, with ice cream bars made it that much better. Thanks to all who helped.

No comments:

Post a Comment